- At least 8 years of practical working experience in the related field in building construction projects.
- Professional certification such as ADDA and CADD certifications will be preferred.
- Proficient in using BIM, Revit, CAD and AutoCAD softwares.
- Knowledge of 3D modelling tools.
- Report to the Technical Manager and/or Construction Manager, and responsibilities include: -
Liaise with architects and engineers to gather details, designs, requirements and information;
Calculate dimensions, weight limitations and requirements in materials;
Create detailed designs with computer-aided design (CAD) software;
Design diagrams, maps and layouts to illustrate workflow;
Prepare and review rough sketches and review them along with the engineering team;
Identify potential operational issues and redesign products to improve functionality;
Create manuals that describe existing products’ operation, features and maintenance, and
Compile technical proposals and materials for submission.
- Positive attitude, self-motivated, initiative and responsible.
- Detail-oriented individual.
- Good time management skills to work on deadlines.
- Good communication and interpersonal skills.
- Able to work independently.
- A Degree in Architectural or Engineering (Civil / Structural / Mechanical / Electrical) is preferred
- Remuneration shall commensurate with qualifications and experience. Basic salary: S$3,300.00 to S$5,500.00, plus allowances.
Sato Kogyo
traces its roots to one of the oldest turnkey contractors in Japan. Established in 1862 and headquartered in Tokyo, Sato Kogyo laid the cornerstone of modern building technology by focusing on and developing newer and more efficient construction methodologies that are still relevant around the world today.
Over a rich history of more than 140 years, Sato Kogyo has accomplished numerous types of building and civil engineering projects of varying scale, nature and complexity from Japan to United States, Singapore to Malaysia and Thailand to China. In 1972, the firm recognised the growing construction activities in the Asia Pacific region and spreaded its wings beyond the shores of Japan. Expanding rapidly in response to its success, Sato Kogyo set up offices in Singapore, Kuala Lumpur, Bangkok and Xi’an. The strength of the Singapore Office has evolved into a Regional Headquarters in 2002 to oversee the emerging East Asian markets.