jobs in AG STAFFING

全职 Commissioning Managers - Data Centre Construction - PMC - Johor Bahru 工作, 薪水 up to MYR 15,000, AG STAFFING Johor 公司招聘中 - Ricebowl

Commissioning Managers - Data Centre Construction - PMC - Johor Bahru

分享
保存

工作地点

  • Johor Bahru Johor Malaysia

职位描述

岗位职责

Commissioning Managers - Data Centre Construction - PMC - Johor Bahru

Key Responsibilities

1. Master Commissioning Strategy & Plan Development

  • Plan Ownership: Write, update, and implement the comprehensive Project Commissioning Plan, Scripts, and Matrix outlining testing methodologies for all MEP systems.
  • Script Engineering: Author hyper-detailed, step-by-step testing procedures (scripts) for component, system, and integrated testing phases (including component isolation and failover sequences).
  • BIM & System Tagging: Coordinate with the Building Information Modeling (BIM) and asset management teams to ensure every valve, breaker, sensor, and chiller is accurately logged, tagged, and tracked.

2. Execution of the 5 Levels of Commissioning

  • Level 1 (Factory Acceptance Testing - FAT)
  • Level 2 (Site Acceptance Testing - SAT)
  • Level 3 (Pre-Functional Testing / PFT)
  • Level 4 (Functional Performance Testing / FPT)
  • Level 5 (Integrated Systems Testing / IST)

3. Vendor, Client & Authority Management

  • Hyperscale Client Interfacing: Act as the direct site conduit to client engineering teams to validate and sign off on technical commissioning milestones.
  • Regulatory Submissions: Support the appointed Suruhanjaya Tenaga (ST) Competent Engineers, BOMBA inspectors, and DOSH engineers during statutory validation runs, safety certifications, and energization handovers

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM15,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多