RFQ during the project initiation phase (Assy-Cycle time / Investment Cost…). Layout Design during the pre-project phase (Line capability / manpower / Assy Line Utilization…)
During the initial project stage, provide design concepts and technical requirements for tooling fixtures/equipment.
After processing is completed, conduct commissioning and acceptance; prepare assembly process documents (SOP & WI), train and assess operators for work.
During the project trial production phase, divide workstations from the perspective of process rationality and adjust the production line balance; cooperate closely with other relevant departments to promptly solve production problems (defective product analysis, fixture and equipment problem analysis and improvement, etc.)
Complete orders on time under the premise of ensuring product quality.
During the project mass production phase, continuously improve the production line (Check Cycle time / Calculate the manpower / Automated utilization rate).
Continuously search and investigate new technologies.
Continuously improve the handling of project problems and abnormal analysis for the projects in charge.