jobs in AG Staffing Malaysia

全职 Document Controller - PMC (Data Center- Construction- Mission-critical projects) 工作, 薪水 up to MYR 8,000, AG Staffing Malaysia Selangor 公司招聘中 - Ricebowl

Document Controller - PMC (Data Center- Construction- Mission-critical projects)

MYR5,000 - MYR8,000 每月
分享
保存

工作地点

  • Subang Jaya Selangor Malaysia

职位描述

岗位职责

The Document Controller manages, organizes, and distributes construction project documentation—drawings, specifications, contracts, and RFIs—to ensure the correct, up-to-date information reaches architects, engineers, and contractors. They maintain document control, track revisions to prevent errors, and use Procore to manage technical data.

Key Responsibilities

  • Document Management: Organizing, storing, and retrieving electronic and hard-copy documents.
  • Version Control: Ensuring only the latest revisions of drawings and documents are used on-site.
  • Transmittals and Submissions: Handling the formal submission and receipt of documents between contractors, consultants, and clients.
  • Logging and Tracking: Maintaining accurate records in registers of all incoming/outgoing documents.
  • Reporting: Producing document progress reports for project managers.
  • Quality Control: Checking document formats and accuracy before distribution.

Preferences:

  • Technical Knowledge: Familiarity with construction documents, engineering drawings, and industry terminology.
  • Software Proficiency: Experience with Procore/ EDMS systems
  • Attention to Detail: High precision in tracking revisions, numbering, and document metadata.
  • Organization: Ability to handle large volumes of documents and multitask.
  • Good command of business writing and English
  • Office administration
  • ISO compliance knowledge
  • Strong organizational skills and ability to manage project documentation accurately and efficiently.

Added Advantage:

  • Familiarity withAriba / SAP procurement systems
  • Business proposal experience

Job Type: Full-time

Pay: RM5,000.00 - RM8,000.00 per month

Work Location: In person

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多