- Johor Bahru Johor Malaysia
工作地点
职位描述
岗位职责
Job Description: MEP QA/QC Engineer
Position Purpose
The MEP QA/QC Engineer is the guardian of project quality. Data centres cannot afford single points of failure. This role ensures that all equipment, materials, and installation methods strictly follow the design specifications, local codes, and global uptime certifications.
Key Responsibilities
· Inspections: Conduct daily site inspections and issue Non-Conformance Reports (NCR) when work does not meet structural or quality standards.
· Documentation: Prepare, organize, and maintain the Project Quality Plan, including Material Inspection Requests (MIR) and Work Inspection Requests (WIR).
· Audit Management: Manage pre-commissioning documentation and check sheets required for final handover to the client operations team.
· Material Validation: Verify that incoming MEP materials match approved samples and technical data sheets before delivery to the floor.
· Witness Testing: Attend and sign off on factory acceptance tests (FAT) and site acceptance tests (SAT) for critical equipment.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
重要安全守则
申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。