jobs in Terotechnology Global Sdn. Bhd

Terotechnology Global Sdn. Bhd Hiring! Full Time BIM Modeler (Data Center Construction) in Selangor, Earn up to MYR 6,000 - Ricebowl

BIM Modeler (Data Center Construction)

MYR6,000 - MYR6,000 Per Month
Share
Save

Working Location

  • Cyberjaya Selangor Malaysia

Job Description

Responsibilities

Job Summary

  • Translates complex architectural, structural, and dense MEP designs into data-rich 3D digital models.
  • Focuses on zero-fault clash detection, precise spatial tolerances, and multidisciplinary coordination for mission-critical infrastructure.

Core Responsibilities

  • Model Authoring: Build and maintain detailed 3D models (LOD 350–500) for data center infrastructure using Autodesk Revit.
  • Documentation: Generate accurate, construction-ready 2D shop drawings, plans, and schedules directly from the 3D models.
  • Clash Detection: Run spatial coordination checks using Navisworks Manage to resolve system conflicts (e.g., heavy electrical containment vs. cooling systems) before on-site installation.
  • Standard Compliance: Adhere strictly to the project's BIM Execution Plan (BEP), naming conventions, and client-specific data center standards.
  • Data Integration: Link 3D models to construction schedules (4D) and cost estimates (5D) as required.
  • Collaboration: Update models based on design changes (RFIs) and coordinate seamlessly with engineers, trade subcontractors, and client teams.

Education & Experience

  • Education: Degree or Diploma in Architecture, Engineering (Civil/Mechanical/Electrical), or a dedicated BIM/VDC discipline.
  • Experience: 2–5 years as a BIM Modeler, with a strong preference for experience in data centers, mission-critical infrastructure, or high-density industrial projects.
  • Certifications: Professional certification in Autodesk Revit or Navisworks is highly desirable.

Software & Hardware Requirements

  • Core Software: Advanced proficiency in Autodesk Revit, Navisworks Manage, and AutoCAD.
  • Collaboration Tools: Experience with Autodesk Construction Cloud (ACC) / BIM 360 for cloud collaboration.
  • Reality Capture: Familiarity with Autodesk ReCap for processing site laser scans and point cloud data.
  • Hardware Capability: Proven experience operating high-performance BIM workstations (Intel i7/i9 or AMD Ryzen, NVIDIA RTX/Quadro graphics, minimum 32GB RAM) capable of handling massive, high-density data models.

Key Skills & Competencies

  • Deep understanding of high-density MEP coordination, engineering principles, and blueprint reading.
  • Extreme attention to detail regarding exact equipment dimensions and maintenance access clearances.
  • Strong problem-solving and communication skills to resolve design issues with site stakeholders.

Pay: From RM6,000.00 per month

Benefits:

  • Health insurance
  • Parental leave
  • Professional development

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More