jobs in RANDSTAD PTE. LIMITED

全职 Data Centre Construction Manager (Electrical) 工作, 薪水 up to SGD 10,000, RANDSTAD PTE. LIMITED Central Region (Singapore) 公司招聘中 - Ricebowl

Data Centre Construction Manager (Electrical)

RANDSTAD PTE. LIMITED

SGD10,000 - SGD10,000 每月

Central Region (Singapore)

分享
保存

工作地点

  • 8 CROSS STREET Central Region (Singapore) Singapore

职位描述

岗位职责

Key Responsibilities

  • Plan and supervise a wide range of construction projects from start to finish
  • Organize and oversee construction procedures to ensure they are completed in a timely and efficient manner
  • Manage the overall implementation and completion of projects within the scheduled time, cost, and quality
  • Recommend appropriate risk control measures to reduce or eliminate risks identified during assessments
  • Monitor the progress of projects and update management regarding any schedule variances
  • Develop, monitor, and review equipment and manpower deployment plans for project sites
  • Assist in plan and specification analysis to provide clear and traceable designs and drawings for construction

Qualifications

  • Bachelor’s degree or above in Electrical Engineering (A Master's degree is highly advantageous).
  • 10+ years of DC construction / greenfield project is required for the role
  • Excellent knowledge of relevant rules, regulations, and quality standards
  • Holding an EMA Licensed Electrical Worker (LEW) certification in Singapore is a massive plus

If you are interested in the position

Please include your availability, expected salary and reason for leaving current job

We regret that only shortlisted candidates will be contacted

EA: 94C3609 / Reg: R1325913

重要安全守则

申请工作时,切勿提供您的银行或信用卡详细资料。不要转账或完成无关的在线调查问卷。如果您发现可疑内容,请举报此招聘广告。

了解更多